Power turbine engineer and mechanic
- 1500 €
- Polska (Wrocław)
- 03-01-2023

Osoba kontaktowa: Stas Seredyuk
Kraj rezydencji: Białoruś
Wiek: 28
Telefon:
Doświadczenie zawodowe:
1) Overhaul of the R-50-130/22 turbine (repair of the cylinder flow section)
Mogilev Thermal Power Plants -2
2)Overhaul of the turbine PT-135-130/13 (repair of the oil system and
control of the metal of the pipelines and the cylinder) Mogilev Thermal
Power Plants -2
3)Overhaul of the R-6-8,8 turbine (repair of the cylinder flow section)
Mogilev Thermal Power Plants -1
4)Overhaul of the SS-70-8,8/1,4/0,7 turbine (repair of the steam
distribution system) of the Svetlogorsk Thermal Power Plants
5)He participated in the installation of the TR-24 turbine. (At all nodes)
Mogilev Thermal Power Plants -2.]
7)Installation and removal of SGT-300 generator. Mogilev Thermal Power
Plants -3
8)Overhaul of the 0.3 MW hydro generator. Chigirinskaya Hydro Electric
Station
9)Inter-repair period (major, medium and current repairs of auxiliary
equipment)
10) Repair of pumps of various complexity during the repair period at the
Belorussian Nuclear Power Plant
Mogilev Thermal Power Plants -2
2)Overhaul of the turbine PT-135-130/13 (repair of the oil system and
control of the metal of the pipelines and the cylinder) Mogilev Thermal
Power Plants -2
3)Overhaul of the R-6-8,8 turbine (repair of the cylinder flow section)
Mogilev Thermal Power Plants -1
4)Overhaul of the SS-70-8,8/1,4/0,7 turbine (repair of the steam
distribution system) of the Svetlogorsk Thermal Power Plants
5)He participated in the installation of the TR-24 turbine. (At all nodes)
Mogilev Thermal Power Plants -2.]
7)Installation and removal of SGT-300 generator. Mogilev Thermal Power
Plants -3
8)Overhaul of the 0.3 MW hydro generator. Chigirinskaya Hydro Electric
Station
9)Inter-repair period (major, medium and current repairs of auxiliary
equipment)
10) Repair of pumps of various complexity during the repair period at the
Belorussian Nuclear Power Plant
Edukacja:
Belarusian National Technical University
September 2014 - June 2019
Faculty of Energy/ Thermal Power Plant Engineer
average mark 7,8
September 2014 - June 2019
Faculty of Energy/ Thermal Power Plant Engineer
average mark 7,8
Umiejętności zawodowe i inne:
Team Work
Responsible
Leadership
Communication
Adapting to the environment
Responsible
Leadership
Communication
Adapting to the environment
Dodatkowo:
LANGUAGE
English Pre-intermidiate
Belorussian proficiency
Russian proficiency
English Pre-intermidiate
Belorussian proficiency
Russian proficiency

