Doświadczenie w pracy:
Florilor 28/2 Apt.483
Riscani/Chisinau/MOLDOVA Skype: ozlersahin
MD Gsm Tel : +373 78 677034
TR Gsm Tel: +90 539 729 55 35
Whatsup:+...34
e-mail: ozlersahin@hotmail.com
Ozler SAHIN
Personal Information Martial Status: Married
Nationality: T.C. (Turkish)
Birth of Place/ Birth of Date: Gaziantep / 17.04.1981
Work Experiences
2018/08 - 2020/12 SUMMA A.Ş. CONSTRUCTION INC. (MOLDOVA)
CHISINAU ARENA MULTIFUNCTIONAL SPORT COMPLEX (32.000 m2) Chisinau- MOLDOVA
Electrical Engineer /Electrical Site Chief
• Multi-Purpose Arena Building with 5.000 spectator seat capacity (18.000 m2), Aquapark and Olympic Pool Building (12.000 m2) , Tennis Club Buildings (2.000 m2) with 8 Outdoor Tennis Courts and External Technical Buildings, on a land of 100.000 m2, with a total closed area of 32.000 m2. Performing the electrical works of the Sports Complex Project including the buildings and performing the construction site administration as the Electrical Construction Site Chief.
• Preparation of Construction Projects and submitting them to the Site; preparing the As- Built Projects and Documentation of the Completed Works for the Operation and Maintenance Team.
• Preparation of Material Approval Forms for Medium Voltage, Low Voltage and Weak Current Systems and their approval by the Consultant, Ordering of materials to the Head Office.
• Preparing the Site Working Plan and Program and ensuring coordination with other parts.
• Preparation of Employer Progress Payments.
• The management and administration of the Subcontractors, the control of their progress payments.
• Information exchange, reporting and coordination with the Head Office.
2016/06– 2018-07 OZVO ENGINEERING SRL Chisinau , MOLDOVA
Electrical Engineer
• Site management of various Fit-Out Projects, placing material orders and preparing progress payments.
• Preparation of proposals, estimates and quantities for various projects.
2014/08–2016/05 SUMMA A.Ş. CONSTRUCTION INC. (MOLDOVA)
RADISSON BLU LEOGRAND HOTEL
(18.000 m2) Chisinau, MOLDOVA
Electrical Engineer /Electrical Site Chief
• 18.000 m² Radisson Blu Chisinau 5 Star Hotel Project (110 Standard Type Rooms, 10 Business Class, 1 King Suite, Suit Rooms, 3 Dividable Ballrooms, Restaurant, Casino, Fitness Center, Meeting Rooms, Conference Hall, Infrastructure Electrical Works Carrying out the electrical works of the External Technical Buildings, External Lighting, Energy Center, Boiler Room, Kitchen, Washing House and performing the construction site management as the Electrical Site Chief.
• Preparation of Construction Projects and submitting them to the Site; preparing the As- Built Projects and Documentation of the Completed Works for the Operation and Maintenance Team.
• Preparation of Material Approval Forms for Medium Voltage, Low Voltage and Weak Current Systems and their approval by the Consultant, Ordering of materials to the Head Office.
• Preparing the Site Working Plan and Program and ensuring coordination with other parts.
• Preparation of Employer Progress Payments.
• The management and administration of the Subcontractors, the control of their progress payments.
• Information exchange, reporting and coordination with the Head Office.
2012/04–2014/02 SUMMA A.Ş. CONSTRUCTION INC. (MOLDOVA)
1- RCH New Surgery Block HOSPITAL PROJECT & 2-Crown Plaza Park RESIDENCE PROJECT
(1- 10.500 m2 / 2- 16.000 m2) Chisinau , MOLDOVA
Electrical Engineer /Electrical Site Chief
• Carrying out the electrical works of the 10.500 m² Operating Room and Intensive Care Building Project of the Moldova Fully Equipped State Hospital and performing the construction site administration as the Electrical Site Chief.
• Carrying out the electrical works of the 16.000 m2 Crown Plaza Park Residence Project (88 Flats, 4 Commercial Areas, Closed and Open Parking Lot, Fitness) which is under construction simultaneously with the Hospital Project and performing the site management as a Site Chief.
• Preparation of Construction Projects and submitting them to the Site; preparing the As- Built Projects and Documentation of the Completed Works for the Operation and Maintenance Team.
• Preparation of Material Approval Forms for Medium Voltage, Low Voltage and Weak Current Systems and their approval by the Consultant, Ordering of materials to the Head Office.
• Preparing the Site Working Plan and Program and ensuring coordination with other parts.
• Preparation of Employer Progress Payments.
• The management and administration of the Subcontractors, the control of their progress payments.
• Information exchange, reporting and coordination with the Head Office.
2011/03–2012/03 TEPE CONSTRUCTION INC. (IRAQ)
SUC (Suleymany New University Campus ) UNIVERSITY PROJECT Suleymaniye, IRAQ (Phase-1&Phase-2)
(325.000 m2)
Electrical Engineer /Electrical Site Chief
• Faculty Buildings with a total closed area of 325,000 m², Rectorate, Library, Computer Center, Cultural Center, Indoor and Outdoor Sports Facilities, Stadium, Central Cafeteria, Dormitories and Outdoor Sports Facilities, Power Center, Treatment Facilities, etc.) Electrical works of the superstructure buildings and performing the construction site management as the Electrical Construction Site Chief.
• Making Medium Voltage, Low Voltage and Weak Current Electrical Infrastructure works of 2.000.000 m2 University Campus Land (Medium and Low Voltage Power Cabling Distribution, Road Lighting, Park and Garden Lighting, Infrastructure and Cabling of Weak Current Systems).
• Preparation of Construction Projects and submitting them to the Site; preparing the As- Built Projects and Documentation of the Completed Works for the Operation and Maintenance Team.
• Preparation of Material Approval Forms for Medium Voltage, Low Voltage and Weak Current Systems and their approval by the Consultant, Ordering of materials to the Head Office.
• Preparing the Site Working Plan and Program and ensuring coordination with other parts.
• Preparation of Employer Progress Payments.
• The management and administration of the Subcontractors, the control of their progress payments.
• Information exchange, reporting and coordination with the Head Office.
2010/04–2011/01 SUMMA A.Ş. CONSTRUCTION INC. (MOLDOVA)
MEDPARK INTERNATIONAL HOSPITAL PROJECT
(12.000 m2) Chisinau, MOLDOVA
Electrical Engineer /Electrical Site Chief
• Carrying out the electrical works of the 12.000 m² Fully Equipped Hospital Project and performing the site administration as the Electrical Site Chief.
• Preparation of Construction Projects and submitting them to the Site; preparing the As- Built Projects and Documentation of the Completed Works for the Operation and Maintenance Team.
• Preparation of Material Approval Forms for Medium Voltage, Low Voltage and Weak Current Systems and their approval by the Consultant, Ordering of Materials to the Head Office.
• Preparing the Site Working Plan and Program and ensuring coordination with other parts.
• Preparation of Employer Progress Payments.
• The management and administration of the labor subcontractors, the control of their progress payments.
• Information exchange, reporting and coordination with the Head Office.
2009/07–2010/04 NURSOY A.Ş. CONSTRUCTION INC.(Ankara)
DUHOK 5 STAR HOTEL PROJECT
(30.000m2) Duhok, IRAQ
Electrical Engineer /Electrical Site Chief
• 30.000 m² Duhok 5 Star Hotel Project (180 Type Rooms, 3 King Suites, Suit Rooms, 2 Ballrooms, Restaurant, Disco, 3 Swimming Pools, Casino, Meeting Rooms, Conference Hall, Infrastructure Electrical Works, Surrounding Buildings, Performing the electrical works of the External Lighting, Energy Center, Boiler Room, Kitchen, Washing House and performing the construction site administration as the Electrical Site Chief.
• Preparation of Material Approval Forms for Medium Voltage, Low Voltage and Weak Current Systems and their approval by the Consultant, Ordering of materials to the Head Office.
• Preparing the Site Working Plan and Program and ensuring coordination with other parts.
• Preparation of Employer Progress Payments.
• The management and administration of the Employment Subcontractors, the control of their progress payments.
• Information exchange, reporting and coordination with the Head Office.
2008/01–2008/12 INTEGRA-LLP (KAZAKHSTAN)
Almaty, Kazakhstan
Electrical Engineer /Electrical Group Chief
• Field applications of the low voltage and weak current systems of the 40,000 m² ENKA Esentai Park Res B Residential Building project as ENKA's electrical labour subcontractor.
• Carrying out and delivering the low voltage and weak current electrical works of the Shell Astana Office Fit-Out Project.
• Completion and delivery of low voltage and weak current electrical works of JP Morgan Chase Almaty Office Fit-Out Project.
• Preparation of electrical projects and tender tender documents for the HSBC Esentai Almaty Fit-Out Project.
• Site management of Fit-Out Projects, placing material orders and preparing progress payments.
• Preparation of proposals, estimates and quantities for various projects.
2006/08–2007/11 TES Electrical LLP (KAZAKHSTAN)
COCA-COLA BOTTLING FACTORY (25.000 m2) Almaty, Kazakhstan
Electrical Site Chief
• Providing the planning and management of personnel and materials at the field level for the preparation and completion of Design&Built projects of medium voltage, low voltage and weak current systems of the 25.000 m² Coca Cola Extension Facilities project.
• To ensure the necessary information exchange and coordination with the head office.
• Preparing monthly progress payments and change orders.
2004/12–2006/01 Doğu Electricity-Electronic Industry and Trade Inc. Istanbul (TURKEY)
Project engineer
• Preparation of all medium voltage, low voltage and weak current projects, specifications and other tender documents for the tender of 20.000 m² Marriott Atyrau Residence, 100.000 m² Esentai Tower, 40.000 m² Kazkommersbank projects under the control of Bureau Veritas in accordance with international and Kazakh SNIPs.
• Reconnaissance and proposal preparation for various projects.
• Ensuring coordination with employer companies and other companies involved in the project.
2003–2004 (Military Period) Harp Akademileri Komutanligi Cultural Center Building Istanbul (TURKEY)
Facility Operations Engineer / Reserve Officer
• Operation of the electrical systems and maintenance and repair follow-up of the War Games Simulation and Multi-Purpose Cultural Center (40.000 m²), which is affiliated to the War Academies, under the Technical Operations Directorate.
Education 1999–2003 Sakarya University / Electrical Engineering (Bsc)
1996- 1998 Hayrullah Kefoğlu High School
1994- 1996 Haydarpasa Anadolu Teknik Lisesi Technical High School Electrical Department
1991-1994 Ozel Marmara Private High School (Secondary School)
Foreign Language Knowledge English– Advanced
Russian- Intermediate
Romanian-Intermediate
German – Beginner (A1+A2)
Computer and Software Knowledge Auto-Cad R14-2018
Microsoft Office (Word,Excel,Powerpoint,Outlook, MS Project)
Dialux,Europic,Calculux Lighting Calculation Programs
Driving Licence
Courses Attended Class B
Philips Lighting Seminar
Interests Traveling, Chess, Reading
Umiejętności zawodowe i inne:
Electrical Engineer
Dodatkowo:
Traveling, Chess, Reading