Досвід роботи:
Job experience:
Parliament of the Republic of Azerbaijan, Office of Affairs, Office Technical (2001-2003)
Procurement of office equipment;
Prepare procedures and check the process of its implementation;
Communicate with supplier companies;
Prepare and submit monthly and annual reports;
Prepare the necessary analysis of management reports.
SOCAR, Department of Culture and Leisure Methodist / Engineer (2006-2013)
Organization of events for the effective leisure of oil workers and oil family members;
Management of the company's cultural centres, equipping them with the necessary equipment;
Organization of meetings, conferences and concerts organized by the company;
Preparation of action plan for celebrations and festivities;
SOCAR, Neftchi Sports Club, IT Engineer (2013-2016)
Local server installation (MC server);
Administration of all computers connected to the server;
Ensuring program security;
Installation and commissioning of new equipment;
Encoding of each of the available users on the server separately;
Carry out weekly monitoring and identify and eliminate problems that have arisen or may arise in advance.
Helpdesk
Microsoft Windows 7,8,8.1,10 and Mac OS installation;
Azfen JV, QA-QC and Guidance On Certification (GOC) engineer (2016-2018)
Manufacture Data Record (MDR) engineer:
Keeping the HSE standard at an increasing pace all over the site;
Organizing and controlling databases;
Control of all Manufacture Data Records as per QA procedure;
Revising of all steel structure drawıng as per project standards;
Controlling and revising of weld map drawing;
Controlling Visual Inspection Test Reports (VT), Magnetic Particle Inspection Test Reports (MPI), Ultrasonic Inspection Testing Reports (UT), Penetration Inspection Test Reports (PT), and Radiographical Inspection Reports (RT) according to QA procedures;
Controlling and revising the weld register as per weld map drawing;
Reviewing and updating Welding Data Base, Test Packs and Spool Release;
Preparing and updating all documents related to the QC department (Test packs, weld-fit-up-erection reports, joint history, update and change drawings, welder certificates etc.)
Monitoring Daily Welding Activities As per Approved WPS
Checking certificates according to client QA/QC procedures;
Preparing weekly activity reports;
General administration in this area;
Checking piping, support and structural drawing reports, paint release, NDT reports, test pack and input reports to the system.
Preparation of daily, weekly & monthly reports on behalf of the QA Department.
Certification Engineer (GOC) Engineer:
Preparation of reports and certificate packages
AGT Region Certification Procedure C8 Standards Transfer Certification Package (HCP) Cover, Index, SH1, MC1, PL1, LOSH, CITS and Preparation of Certificates
Quality assurance by design standards (required documents, quality certificates of equipment, etc.)
Inclusion of data in HCP (Handover Completion Pack) to ensure continuous accurate delivery records;
Obtain the set of records required to access the Certification Guide Database (project completion system) from the construction department, installation authority or commissioning authority to track certification.
Review and verify the accuracy, completeness, correct identification, and orderliness of certification documents.
Verification of data sets in the ITR sheets in the audit Certification Manager's (GOC) records.
Control over the preparation of the Delivery Certificate Package (HCP)
Include details of the Punch list item in the instructions in the certification database, as well as maintain the status of Punch lists and Punch list items. Make sure the punch lists are entered in the correct HCP.
The inclusion of TQ, EQ, DVR and MOC details is entered into the GOC database and the status of these elements is maintained.
Prepare documents, for example. Technical condition reports, technical summaries, verification of conformity, etc. for storage or purchase of certificates are included in the group's responsibility.
Documentation and type certificate management related to the maintenance of existing type certificates
Leads the team responsible for creating certification/test plans and related reports
Evaluate design changes to affect existing certification and continuous flight suitability.
ENCOTEC Construction QA/ QC inspector (2018- 2020.01)
(civil, steel structural, mechanical and piping, HVAC, electrical instrumentation, firewater,
fire and gas system)
Keeping the HSE standard at an increasing pace all over the site;
Civil
Executing the specific inspections on materials, equipment and construction/installation activities on-site;
Issuing the relevant Quality Records and, when necessary, writing and sending reports;
Checks the preparation of foundations.
Checks the correct preparation of reinforcements;
Checks the certifications regarding element mixes;
Be sure of weather during pouring operations (checking temperature);
Checks moisture content with equipment;
Checks compression strength test (slum test)
Making the cub test (7 and 28 days cub test result ) for the quality of concrete;
Checks after concrete pouring;
Checks materials quality (wire, fitting etc.);
Check the documents certifying the tests, controls and inspections carried out;
Check the conformity with the Quality Control Plan and obtain the relevant documentation.
Ensuring the correct implementation of the approved Inspection Test Plan according to Clients' requirements.
Steel Structural
Manage pre-construction planning activities, review and comment on the Contractor’s construction schedules, method statements, and risk assessments for the structural steelworks;
Oversee the recording and regular updating of the progress of the works, records are available to indicate the progress of the works at all stages of the contract;
Reviewing the contractor’s progress at all times;
Monitoring the material incorporated in the work, the materials stored at the site, and the contractor’s manpower and equipment;
Attending weekly, monthly, and other progress & technical meetings held at the site as required;
Reviewing inspector’s daily reports and generally overseeing the inspector’s daily activities including works assignments, on-site performance, and supervising the contractor’s operations;
Maintenance of the filing system to record all inspection reports;
Inform the Contractor of any instances of non-compliance work using standard QA protocols;
Work with the Safety Engineer to monitor the Contractors safety arrangements and respond promptly to any safety concerns raised by the Safety Engineer;
Mechanical and Piping
Familiarity and use of department design and drafting standards;
Producing detailed design calculations and sketches for materials of construction associated with the project;
Reviewing and checking vendor drawings and other discipline drawings for mechanical input;
Assisting in accomplishing engineering activities such as stress analysis, construction specifications, material procurement specifications and calculations;
The Piping QC inspector is responsible for creating the initial project scope for all of the tasks that need to be completed in order to install a piping system. They must take into account cost, resources and the project deadline;
Responsible for going to the installation site of a piping system and surveying the land for any irregularities;
Then analyzing these observations as a part of the process for creating system blueprints;
Know exactly what types of materials are necessary to create a piping system that withstands the elements;
Responsible for sourcing these materials and then ensuring these materials are used in the installation process;
Preparing tests for pipelines. Flushing and Leak test for the waterline; preparing all documents for testing (SF1, SL1, JI1and chart test).
HVAC
Checking HVAC Installation;
Checking of mechanical drawings, documents and projects for compliance with current mechanical standards;
Consultations with architects and engineers, HVAC contractors, builders and homeowners on code requirements for HVAC systems;
Ensuring that Project Quality Plans and procedures are activated at the site;
Performing inspections of installations when advised by construction-in-charges/ site Supervisors;
Monitoring the phases of quality control of work as per specification;
Electrical - Instrumentation
Checking conformity with the Quality Control Plan, obtaining the relevant documentation, checking procedures and equipment to be used in tests, controls and inspections, managing documents certifying tests, controls and inspections;
Be sure of the correct implementation of the approved Inspection Test Plan;
Witnessing the tests, controls and inspections carried out;
Verifying special processes and the relevant workers’ qualifications;
Be sure the inspections on materials, equipment and construction/installation activities on-site;
Issuing the relevant Quality Records and, when necessary, writing and sending to QC Supervisor non-conformance reports
Performing all relevant loop checks.
Performing PL operations.
Checking power transformers, switchboard, accumulator battery, sockets outlet, lighting system.
Performing visual inspections, dimensional tests, checks rating and material for connection.
Preparing documents for tests of continuity, and insulation resistance.
I was checking the installation of instruments.
Performing tests of functional instruments.
Checks pneumatic signal connection.
Performing test communication functionalities.
North West Construction, Site Engineer (2020 – 2022)
Keeping the HSE standard at an increasing pace all over the site;
The site Engineer is under the Project Manager’s command;
Supervised and monitored project subcontractors and the labour force
To manage the Project’s Work;
To develop the work program for 4 weeks;
To forecast the project works, control forecasting, and make amendments;
Assists the PM to develop the programs of construction maintenance work;
Assists the PM to develop the construction drawings and technical specifications;
Assists the PM in choosing contractors including opening up the tender and proposals processes;
Conducts project documentation;
Attends in money costs management on the project according to the budget;
Controls the compliance with occupational safety rules, and environmental protection during the project execution;
Controls quality of project works;
Executive drawings that were organized in the correct form and other documents that shall be presented to the customer;
To participate in the timely resolution of issues arising from the construction process;
To participate in the ensuring of objects provision during the period mentioned in the plan;
To report monthly to Project Manager;
To perform related other tasks by Department Manager/Management;
To perform related other tasks by Project Manager/Management;
FC "UzLITI Engineering" LLC, Senior Quality Control Specialist (2022 – at present)
Carrying out regular analyses, customer feedback, fulfilment of the set objectives, quality policy on the permanent suitability, performance of works (services) in accordance with the requirements of standards and specifications, approved samples and technical documentation.
Ensures continuous improvement of the quality management system on the basis of such analyses, through corrective actions, and determination of goals and objectives in the field of quality.
Compliance of the performed works with the requirements of state, inter-branch, industry and internal regulatory and technical and other regulatory documents.
Management of measures to improve the quality of design and technical documentation (works, services), fulfilment of all applicable requirements for the company's quality management system, development and implementation of the quality management system, standards and regulations, indicators governing the quality of design and technical documentation (works, services), the most advanced control methods.
Effective use of existing internal typing materials that improve the quality of design and estimate documentation being developed and reduce labour costs (forms, blanks, samples, etc.).
Effective use of scientific and technical, patent and other information, the specific use of which is stipulated by the head of works when issuing the assignment. 3.7.
The absence of errors in the developed documentation leads to inoperability, violation of reliability, and safety of objects, as well as the absence of errors leading to impossibility or inadmissibility of implementation of the developed documentation in the form presented by the contractor.
Absence of mutual inconsistencies in the developed documentation; absence of inconsistencies of the designed elements with adjacent elements; absence of inconsistencies of the developed material with other related materials.
Quality design of graphic and text materials, sufficient completeness and absence of unnecessary information contained in the documentation under development, compliance of its composition, content and design with current standards and other normative materials.
Absence of other technical, mathematical, logical, spelling, etc. errors and inaccuracies in the documentation being developed.
Approval, if necessary, of the accepted methods of calculations with the Head of Works.
Qualitative correction of defects detected by inspectors and work supervisors.
The chief specialist as an inspector shall ensure completeness, quality and timeliness of the inspection in terms of:
- Compliance of the inspected works with the requirements of state, interbranch, industry, internal regulatory and technical and other regulatory documents.
Management of measures to improve the quality of design and engineering documentation (works, services), fulfilment of all applicable requirements for the company's quality management system, development and implementation of the quality management system, standards and regulations, indicators governing the quality of design and engineering documentation (works, services), the most advanced control methods.
Efficient use of existing internal typing materials that improve the quality of the design and estimate documentation being developed and reduce labour costs (forms, blanks, samples, etc.).
Effective use of scientific and technical, patent and other information, the specific use of which is stipulated by the head of works when issuing the task.
Projects:
2016-2018 Shahdeniz 2 Sangachal Terminal
2018-2020 Shahdeniz 1 Sangachal Terminal, BTC,WREP and e.t.c :
1. Drainage surface improvement around flare at phase 2(ST0221)
2. ACG Line Exposal at SD1 area (ST 1169 30”)
3. ACG Line Exposal at the non-industrial area (ST 1169- 30”)
4. NREP line Road Crossing Exposal (ST1170- 20”)
5. SD16” HP line Exposal at ST 2 Location (ST1173)
6. Sangachal Terminal FWRM Civil Works 14” PW line DIG1 and DIG2 (ST 1155)
7. 30” Azpetrol Line Exposal (ST 1183)
8. Kurchay East River Crossing Remediation Works (Azerbaijan WREP Pipeline AZ1139)
9. Tovuzchay River Crossing Remediation Works (Azerbaijan BTC Line AZ021)
10. Kurakchay River Crossing Remediation (Azerbaijan WREP Pipeline AZ1019)
11. Sangachal 1 Terminal Laboratory, Locker & Data Center Buildings (Construction, Fit-out and
Commissioning Works ST0014)
Sangachal 1 Terminal Laboratory, Locker & Data Center Buildings Civil/Structural works. Tie-in
scope (ST0014)
12 DDM Tower foundation, construction and spread beam installation (E817 MHWIRTH)
13. Construction of Steam Turbine Building Pit, Foundations And Fire Wall At L38 Area (Uniper
Company. Sumgait City)
14. Bravo Markets Project
15. Construction of GCDD MTO in Bukhara Oblast. RD stage. UTOS
16. Baysun Gas Processing Plant
Професійні та інші навички:
Certifications and Awards:
2011 - Awarded for participating actively in social-cultural activities by SOCAR
2011 - Ministry of Youth and Sport of the Republic of Azerbaijan
Awarded for applying the youth policy of the state by
2017 - Zygon Consulting - ISO 9001:2015 internal auditor
2019- TEC Civil QA/QC Engineer
2019- TEC Construction QA/QC engineer
2020- TEC Construction Civil Engineering
2020- TEC Fundamentals of Civil Engineering
2020- TCS NDT (Non-Destructive Testing) Seminare
Додатково:
Personal Qualifications:
Precautionary measures and accuracy.
Seriousness, responsibility and real work in self-help, to work on the task in advance and at a high level;
Obey the rules of dress, dress neatly;
He is not afraid of difficult work, he takes responsibility;
Maintain kindness in the team, and gain respect and sympathy for the staff I work with.
To deserve collective leadership, to respect the opinion of each person in the team, to listen to them individually and to work on a common decision;
Additional Information:
Autocad, Tekla, Corel Draw X8, Photoshop CS, Windows Server, use of network equipment, installation of telephone systems, active and passive LAN, LAN cables regardless of location and state, shared Internet access via WAN, analysis and operation of security systems, modem, access point, Technical support printer and scanner to ensure that the IT infrastructure and operating systems are always in good working condition, receive and analyze requests and troubleshoot problems during troubleshooting, eliminate network failures on server and security equipment. Live CDs and DVDs, bootable Hirens CDs and DVDs, troubleshoot problems with a remote computer in TeamViewer software, write and use all kinds of antivirus software, and so on.
Microsoft Windows 7/8/10
Microsoft Server 2003/2018
MAC IOS
Install and deploy software, PCs, tablets and software for all types of laptops
Recover deleted files, download and use the necessary programs.
Work with audio-video files. Writing the necessary programs following the system, ensuring their efficiency, etc.
Manage CCTV cameras, and troubleshoot as much as I can.
Along with the tasks outlined in the Work Book, I have been working as an IT specialist since 2001.
Languages:
Azerbaijani
Turkish
Russian
English
Computer skills:
Microsoft Office 2010-2016 (Word, Excel, Outlook)
Autocad
Tekla
Photoshop, Corel Draw
Mac OS, Windows all
Helpdesk